CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SAN ANTONIO RIVER CONTROL, SAN ANTONIO, DUERO, BOHOL, STA. 0+220.00 - STA. 0+391.00 (RIGHT SIDE); STA. 0+220.00 - STA. 0+269.48, STA. 0+370.65 - STA.0+492 (LEF
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SAN ANTONIO RIVER CONTROL, SAN ANTONIO, DUERO, BOHOL, STA. 0+220.00 - STA. 0+391.00 (RIGHT SIDE); STA. 0+220.00 - STA. 0+269.48, STA. 0+370.65 - STA.0+492 (LEF is a DPWH-tracked public work in Bohol 3rd DEO, Region VII. Reported contract value: ₱9,310,000.00. Status: Reported complete (DPWH). Contractor on record: MUANA CONST AND DEVELOPMENT CORP FORMERLY. Figures trace to dpwh.
Total Contract Cost


