Roads17RB0221

CONSTRUCTION OF FARM TO MILL ROAD OF BANGA MALUBON TO BRGY. MALUBON PROPER (STA. 0+000 - STA. 1+005), SAGAY CITY, NEGROS OCCIDENTAL

CONSTRUCTION OF FARM TO MILL ROAD OF BANGA MALUBON TO BRGY. MALUBON PROPER (STA. 0+000 - STA. 1+005), SAGAY CITY, NEGROS OCCIDENTAL is a DPWH-tracked public work in Negros Occidental 1st DEO, Negros Island Region. Reported contract value: ₱16,519,679.59. Status: Reported complete (DPWH). Contractor on record: AFG ZILLION CONST CORP FORMERLY: A F G CONST. Figures trace to dpwh.

Negros Occidental 1st DEO, Negros Island Region
Region: Negros Island Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱6,588

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-CAR-17-0012607 · · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17RB0221 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2012-04-18 → 2025-11-26

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱16,437,492 per km= 1.0x the Negros Island Region median (n=55)

Contract cost ₱16,519,680 ÷ 1.005 km read from the DPWH title (“STA. 0+000 - STA. 1+005”; K-post / station range length). National percentile: 27. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FARM TO MILL ROAD OF BANGA MALUBON TO BRGY. MALUBON PROPER  (STA. 0+000 - STA. 1+005), SAGAY CITY, NEGROS OCCIDENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱6,588,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures of Himoga-an River (Sta. 0+000 - Sta. 0+212) along Bacolod North Road, Sagay City, Negros Occidental
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-CAR-17-0012607

₱-4,999.00 · FY2017

Released to Regional Office - CAR (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

207 projects · ₱2.6B total · 0 flags

4. Implementation

Contract Amount

₱16,519,679.59

Progress

Reported complete (DPWH)

Start Date

January 16, 2018

Target End

June 4, 2018

5. Audit