CONST. OF FLOOD CONTROL ALONG ABRA RIVER, BANAOANG SECTION, KM. 000+959 - KM. 001+460, DOWNSTREAM
CONST. OF FLOOD CONTROL ALONG ABRA RIVER, BANAOANG SECTION, KM. 000+959 - KM. 001+460, DOWNSTREAM is a DPWH-tracked public work in Ilocos Sur 1st DEO, Region I. Reported contract value: ₱48,999,999.87. Status: Reported complete (DPWH). Contractor on record: A P B CONST. Figures trace to dpwh.
Total Contract Cost

