CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JOSE RIVER, STA. 07+720 STA. 08+020 (PARADA - SAN VICENTE SECTION), SANTA MARIA, BULACAN
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JOSE RIVER, STA. 07+720 STA. 08+020 (PARADA - SAN VICENTE SECTION), SANTA MARIA, BULACAN is a DPWH-tracked public work in Bulacan 2nd DEO, Region III. Reported contract value: ₱96,497,279.07. Status: Past target date (DPWH On-Going). Contractor on record: M3 KONSTRACT CORP FORMERLY:MARGARITA CONST. Figures trace to dpwh.
Total Contract Cost