Construction of Flood Control Structure along Bocaue -Santa Maria River, Sta 02 + 200 - Sta 02 + 350 (Phase 1), Barangay Ubihan, Meycauayan, Bulacan
Construction of Flood Control Structure along Bocaue -Santa Maria River, Sta 02 + 200 - Sta 02 + 350 (Phase 1), Barangay Ubihan, Meycauayan, Bulacan is a DPWH-tracked public work in CITY OF MEYCAUAYAN (BULACAN), BULACAN, Region III. Reported contract value: ₱96,499,989.70. Status: Reported complete (DPWH). Contractor on record: M3 KONSTRACT CORP FORMERLY:MARGARITA CONST. Figures trace to sumbong.
Total Contract Cost