Construction of Flood Mitigation Structure24CD0096

Construction of Flood Control Structure along Bocaue -Santa Maria River, Sta 02 + 200 - Sta 02 + 350 (Phase 1), Barangay Ubihan, Meycauayan, Bulacan

Construction of Flood Control Structure along Bocaue -Santa Maria River, Sta 02 + 200 - Sta 02 + 350 (Phase 1), Barangay Ubihan, Meycauayan, Bulacan is a DPWH-tracked public work in CITY OF MEYCAUAYAN (BULACAN), BULACAN, Region III. Reported contract value: ₱96,499,989.70. Status: Reported complete (DPWH). Contractor on record: M3 KONSTRACT CORP FORMERLY:MARGARITA CONST. Figures trace to sumbong.

CITY OF MEYCAUAYAN (BULACAN), BULACAN, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱50,000

    Probable match · score 0.90

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-24-0006660 · ₱9,979,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24CD0096 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-10-29 → 2025-06-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Bulacan

Based on the coordinates published with the DPWH record and NOAH file Bulacan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control Structure along Bocaue -Santa Maria River, Sta 02 + 200 - Sta 02 + 350 (Phase 1), Barangay Ubihan, Meycauayan, Bulacan

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Sta. Maria River, Sta. 05 + 050 - Sta. 05 + 200 ( Poblacion - Macaiban Section ) , Santa Maria, Bulacan
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-24-0006660

₱9,979,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0007287

₱1,460,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0000163

₱1,078,312.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0007288

₱135,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-24-0016339

₱108,080.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

161 projects · ₱8.0B total · 11 flags

4. Implementation

Contract Amount

₱96,499,989.70

Progress

Reported complete (DPWH)

Start Date

March 14, 2024

Target End

March 9, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.