Rehabilitation of Dike along O'Donnell River, Sta. 10 + 303 to 10 + 614.20, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac
Rehabilitation of Dike along O'Donnell River, Sta. 10 + 303 to 10 + 614.20, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac is a DPWH-tracked public work in CAPAS (TARLAC), TARLAC, Region III. Reported contract value: ₱72,369,873.30. Status: Reported complete (DPWH). Contractor on record: 11-16 CONST. Figures trace to sumbong.
Total Contract Cost






