Rehabilitation of Existing Bank along Lucung River, D/S of Cutcut Bridge (Left and Right Bank), Capas, Tarlac
Rehabilitation of Existing Bank along Lucung River, D/S of Cutcut Bridge (Left and Right Bank), Capas, Tarlac is a DPWH-tracked public work in CAPAS (TARLAC), TARLAC, Region III. Reported contract value: ₱96,483,776.97. Status: Reported complete (DPWH). Contractor on record: 11-16 CONST. Figures trace to sumbong.
Total Contract Cost


