Roads17K00109No coordinates published by DPWH

IMPRVT./WIDENING OF NATL ROADS SH K1517+824-K1522+221&K1524+668-K1525+211,BUK 2ND LD

IMPRVT./WIDENING OF NATL ROADS SH K1517+824-K1522+221&K1524+668-K1525+211,BUK 2ND LD is a DPWH-tracked public work in Region X, Region X. Reported contract value: ₱125,210,122.99. Status: Reported complete (DPWH). Contractor on record: VEN RAY CONST CORP. Figures trace to dpwh.

Region X, Region X

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region X

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17K00109 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱25,346,179 per km= 0.7x the Region X median (n=383)

Contract cost ₱125,210,123 ÷ 4.94 km read from the DPWH title (“K1517+824-K1522+221; K1524+668-K1525+211”; K-post / station range length). National percentile: 20. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: IMPRVT./WIDENING OF NATL ROADS SH K1517+824-K1522+221&K1524+668-K1525+211,BUK 2ND LD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

4. Implementation

Contract Amount

₱125,210,122.99

Progress

Reported complete (DPWH)

Start Date

March 3, 2017

Target End

February 19, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.