Construction of Colby River Flood Control Structure, Sta. 0 + 620 - Sta. 0 + 820 R/S Upstream, Barangay Taburi, Rizal, Palawan
Construction of Colby River Flood Control Structure, Sta. 0 + 620 - Sta. 0 + 820 R/S Upstream, Barangay Taburi, Rizal, Palawan is a DPWH-tracked public work in RIZAL (MARCOS) (PALAWAN), PALAWAN, Region IV-B. Reported contract value: ₱19,599,689.79. Status: Reported complete (DPWH). Contractor on record: SAMURAI CONST. Figures trace to sumbong.
Total Contract Cost
