CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL AT NAYUM RIVER UPSTREAM, SOUTH APPROACH, STA. 0+338.5-STA. 0+760.5, STA. CRUZ, ZAMBALES
CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT NAYUM RIVER UPSTREAM, SOUTH APPROACH, STA. 0+338.5-STA. 0+760.5, STA. CRUZ, ZAMBALES is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱31,675,794.74. Status: Reported complete (DPWH). Contractor on record: STO CRISTO CONST. Figures trace to dpwh.
Total Contract Cost
