REPLACEMENT OF BRIDGE FROM TEMPORARY TO PERMANENT, BALONGLONG BRIDGE (B00331MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, K2015+636 - K2015+957 (PCCP = 265 METERS) PALIMBANG, SULTAN KUDARAT
REPLACEMENT OF BRIDGE FROM TEMPORARY TO PERMANENT, BALONGLONG BRIDGE (B00331MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, K2015+636 - K2015+957 (PCCP = 265 METERS) PALIMBANG, SULTAN KUDARAT is a DPWH-tracked public work in Sultan Kudarat 2nd DEO, Region XII. Reported contract value: ₱36,761,229.12. Status: Reported complete (DPWH). Contractor on record: CS CONST AND SUPPLY INC FORMERLY: CS CONST AND SUPPLY. Figures trace to dpwh.
Total Contract Cost
