Buildings and Facilities16GC0075No coordinates published by DPWH

CONST. OF SHS CLASSROOMS (4ST-20CL), BRGY. SINGCANG AIRPORT NHS, BRGY. SINGCANG, BACOLOD CITY

CONST. OF SHS CLASSROOMS (4ST-20CL), BRGY. SINGCANG AIRPORT NHS, BRGY. SINGCANG, BACOLOD CITY is a DPWH-tracked public work in Bacolod City DEO, Negros Island Region. Reported contract value: ₱37,478,494.44. Status: Reported complete (DPWH). Contractor on record: ALMANA CONST AND DEV'T CORP. Figures trace to dpwh.

Bacolod City DEO, Negros Island Region

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Negros Island Region

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.73

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-16-0000266 · ₱46,447,342 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16GC0075 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,873,925 per classroom= 1.3x the Negros Island Region median (n=274)

Contract cost ₱37,478,494 ÷ 20 classroom read from the DPWH title (“20CL”; classroom count in title). National percentile: 56. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST. OF SHS CLASSROOMS (4ST-20CL), BRGY. SINGCANG AIRPORT NHS, BRGY. SINGCANG, BACOLOD CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 73%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Rehabilitation of Flood Mitigation Facilitites along Bued River, Baguio City LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-16-0000266

₱46,447,342.00 · FY2016

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱37,478,494.44

Progress

Reported complete (DPWH)

Start Date

November 15, 2016

Target End

June 27, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.