CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF BACHAWAN (I-LAYA) FLOOD CONTROL STRUCTURE ALONG TABLAS CIRCUMFERENTIAL ROAD, STA. 000 + 000 - STA. 000 + 104.80 (L/S) (AS PER SURVEY), BACHAWAN, SAN AGUSTIN, ROMBLON
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF BACHAWAN (I-LAYA) FLOOD CONTROL STRUCTURE ALONG TABLAS CIRCUMFERENTIAL ROAD, STA. 000 + 000 - STA. 000 + 104.80 (L/S) (AS PER SURVEY), BACHAWAN, SAN AGUSTIN, ROMBLON is a DPWH-tracked public work in Romblon DEO, Region IV-B. Reported contract value: ₱9,571,707.17. Status: Reported complete (DPWH). Contractor on record: LEGACY CONST CORP FORMERLY: LEGACY CONST. Figures trace to dpwh.
Total Contract Cost



