Flood Control and Drainage18LB0081

INSTALLATION OF GABIONS AND MATTRESSES ALONG DAVAO RIVER BASIN WAAN FLOOD CONTROL, STA. 17+789-STA. 18+387 RIGHT BANK, DAVAO CITY

INSTALLATION OF GABIONS AND MATTRESSES ALONG DAVAO RIVER BASIN WAAN FLOOD CONTROL, STA. 17+789-STA. 18+387 RIGHT BANK, DAVAO CITY is a DPWH-tracked public work in Davao City DEO, Region XI. Reported contract value: ₱60,795,000.00. Status: Reported complete (DPWH). Contractor on record: DIGOS TESSTON CONST & SUPPLIES. Figures trace to dpwh.

Davao City DEO, Region XI
Region: Region XI

Follow the peso

3 of 5 steps linked from public records. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱45,000

    Probable match · score 0.93

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-LGRCB-18-0025292 · ₱50,900,000

    Possible match · score 0.78

    DBM release source ↗
  3. 3. PhilGEPS award

    Not yet linked

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-02-20 → 2026-03-20

    Same record (DPWH contract ID)

    DPWH source ↗
  5. 5. COA audit finding

    Not yet linked

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱101,664 per linear m= 1.0x the Region XI median (n=68)

Contract cost ₱60,795,000 ÷ 598 linear m read from the DPWH title (“STA. 17+789-STA. 18+387”; station range length (Sta. a+b to c+d)). National percentile: 41. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Davao del Sur

Based on the coordinates published with the DPWH record and NOAH file DavaoDelSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Money Trail

1. Appropriation

Probable match · score 93%

UACS
18001
Amount
₱45,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Installation of Gabions and Mattressess along Davao River Basin, Waan Flood Control, Sta. 18+387 - Sta. 18+904, Right Bank, Davao City
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-LGRCB-18-0025292

₱50,900,000.00 · FY2018

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱60,795,000.00

Progress

Reported complete (DPWH)

Start Date

June 10, 2018

Target End

January 9, 2019

5. Audit