Water Provision and Storage24MF0061

CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS) MAUNO E/S, COLUMBIO, SULTAN KUDARAT, CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS) SAL-NAONG E/S, COLUMBIO, SULTAN KUDARAT, CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS) LIMONZO E/S, COLUMBIO, SULT

CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS) MAUNO E/S, COLUMBIO, SULTAN KUDARAT, CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS) SAL-NAONG E/S, COLUMBIO, SULTAN KUDARAT, CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS) LIMONZO E/S, COLUMBIO, SULT is a DPWH-tracked public work in Sultan Kudarat 1st DEO, Region XII. Reported contract value: ₱2,878,133.43. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: FPJ CONST AND SUPPLY. Figures trace to dpwh.

Sultan Kudarat 1st DEO, Region XII
Region: Region XII

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱46,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Banga River ( Sampao Section ) , Isulan, Sultan Kudarat
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Sultan Kudarat 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

4. Implementation

Contract Amount

₱2,878,133.43

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

July 4, 2024

Target End

September 26, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.