Flood Control and Drainage20AH0157

CONSTRUCTION OF RIVERBANK PROTECTION AT BRGY. ORAAN WEST, MANAOAG,PANGASINAN

CONSTRUCTION OF RIVERBANK PROTECTION AT BRGY. ORAAN WEST, MANAOAG,PANGASINAN is a DPWH-tracked public work in Pangasinan 2nd DEO, Region I. Reported contract value: ₱28,809,000.00. Status: Reported complete (DPWH). Contractor on record: KENWOOD CONST ENT CORP FORMERLY:KENWOOD CONST ENT. Figures trace to dpwh.

Pangasinan 2nd DEO, Region I
Region: Region I

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱22,260 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20AH0157 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-09-11 → 2025-08-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Pangasinan

Based on the coordinates published with the DPWH record and NOAH file Pangasinan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF RIVERBANK PROTECTION AT BRGY. ORAAN WEST, MANAOAG,PANGASINAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱22,260,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Agno River Basin Flood Control Project - Construction of River Bank Protection along Brgy. Aliwekwek, Lingayen, Pangasinan
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Pangasinan 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

4. Implementation

Contract Amount

₱28,809,000.00

Progress

Reported complete (DPWH)

Start Date

October 14, 2020

Target End

April 2, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.