Roads19DD0029

LOCAL PROGRAM, LOCAL ROADS AND BRIDGES- LOCAL ROADS- CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, IMPROVEMENT OF ROAD AND DRAINAGE SYSTEM IN BRGYS. SAMPIRO, BUHAY NA SAPA, SAPANGAN, SAN JUAN, BATANG

LOCAL PROGRAM, LOCAL ROADS AND BRIDGES- LOCAL ROADS- CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, IMPROVEMENT OF ROAD AND DRAINAGE SYSTEM IN BRGYS. SAMPIRO, BUHAY NA SAPA, SAPANGAN, SAN JUAN, BATANG is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱9,505,995.11. Status: Reported complete (DPWH). Contractor on record: TONIJON CONST AND DEVELOPMENT INC FORMERLY: TONIJON CONST. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-19-0014483

₱60,000.00 · FY2019

Released to Bata National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

101 projects · ₱661.0M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINAGBAYANAN, TAYSAN, BATA

Batangas 4th DEO, Region IV-A

2024₱29.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

Construction of Flood Control Structure, Paninsingin Bridge, Rosario, Batangas

ROSARIO (BATANGAS), BATANGAS, Region IV-A

2023₱29.4M
Reported complete (DPWH)
No sat.

Construction of Flood Control Structure, Pinagsibaan Bridge 2, Rosario, Batangas

ROSARIO (BATANGAS), BATANGAS, Region IV-A

2023₱29.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAHANADIONG BRIDGE, TAYSAN

Batangas 4th DEO, Region IV-A

2024₱29.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF - CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, SN JUAN-LAIYA RD - K0151 + 510 - K0151 + 808, K0151 + 815 - K0152 + 940

Batangas 4th DEO, Region IV-A

2022₱22.3M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD WITH LINE CANAL AT BRGY. CAWONGAN AND POBLACION, PADRE GARCIA, BATANGAS

Batangas 4th DEO, Region IV-A

2019₱19.0M
Reported complete (DPWH)
View all 101 projects →

4. Implementation

Contract Amount

₱9,505,995.11

Progress

Reported complete (DPWH)

Start Date

May 30, 2019

Target End

July 14, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.