Construction of Bangon Flood Control Structure and Drainage System along Bangon River, Barangay San Jose, Palo, Leyte
Construction of Bangon Flood Control Structure and Drainage System along Bangon River, Barangay San Jose, Palo, Leyte is a DPWH-tracked public work in PALO (LEYTE), LEYTE, Region VIII. Reported contract value: ₱115,759,997.60. Status: Reported complete (DPWH). Contractor on record: EZJONES CONST INC / MWJ CONST. Figures trace to sumbong.
Total Contract Cost






