Flood Control and Drainage17MC0100No coordinates published by DPWH

RECONSTRUCTION OF DAMAGED RIVER BANK SLOPE PROTECTION ALONG M'LANG RIVER POBLACION M'LANG, NORTH COTABATO - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, M'LANG, NORTH COTABATO

RECONSTRUCTION OF DAMAGED RIVER BANK SLOPE PROTECTION ALONG M'LANG RIVER POBLACION M'LANG, NORTH COTABATO - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, M'LANG, NORTH COTABATO is a DPWH-tracked public work in Cotabato 2nd DEO, Region XII. Reported contract value: ₱39,199,649.36. Status: Reported complete (DPWH). Contractor on record: JARGON CONST. Figures trace to dpwh.

Cotabato 2nd DEO, Region XII

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region XII

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.74

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-B-17-0024032 · ₱1,630,926 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱37,083,105 · JARGON CONSTRUCTION & SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: RECONSTRUCTION OF DAMAGED RIVER BANK SLOPE PROTECTION ALONG M'LANG RIVER POBLACION M'LANG, NORTH COTABATO - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, M'LANG, NORTH COTABATO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 74%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures/Slope Protection along Talisay River, Brgy. Ala-Uli, Pilar, Bataan
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-B-17-0024032

₱1,630,926.00 · FY2017

Released to Housing and Urban To Development Coordinating 84 Council (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

17MC0100

₱37,083,105.40 · JARGON CONSTRUCTION & SUPPLY

Award / contract ref: 17MC0100

Contractor

B

397 projects · ₱12.9B total · 0 flags

4. Implementation

Contract Amount

₱39,199,649.36

Progress

Reported complete (DPWH)

Start Date

June 28, 2017

Target End

April 18, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.