Bridges17FO0038

WIDENING OF PAULOG PERMANENT BRIDGE (B00289LZ) ALONG DAANG MAHARLIKA LZ

WIDENING OF PAULOG PERMANENT BRIDGE (B00289LZ) ALONG DAANG MAHARLIKA LZ is a DPWH-tracked public work in Albay 3rd DEO, Region V. Reported contract value: ₱34,103,712.56. Status: Reported complete (DPWH). Contractor on record: HI-TONE CONST. Figures trace to dpwh.

Albay 3rd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-17-0003610 · ₱956,790 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17FO0038 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-01-08 → 2022-04-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: WIDENING OF PAULOG PERMANENT BRIDGE (B00289LZ) ALONG DAANG MAHARLIKA LZ

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Guinobatan Flood Control, Tandarora Section, Guinobatan, Albay
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-17-0003610

₱956,790.00 · FY2017

Released to San Vicente National High School - Buhi (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

555 projects · ₱31.0B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD/SEAWALL, BARANGAY POBLACION, RAPU-RAPU, ALBAY (PHASE 3) RAPU-RAPU, A

Region V, Region V

2023₱236.8M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, MASBATE CITY

Masbate 2nd DEO, Region V

2024₱198.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, DSWD HAVEN FOR DISTRESSED WOMEN, CHILDREN AND, HOME FOR THE AGED AT BARANG

Region V, Region V

2024₱192.1M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-NATIONAL BUILDING PROGRAM-CONSTRUCTION OF 5-STOREY OPD, AMBULATORY AND SPECIALTY CENTER, BICOL REGIONAL TRAINING AND TEACHING HOSPITAL (BRTTH), DARAGA, ALBAY-PHASE 1,DARAGA, ALBAY 2ND L

Region V, Region V

2022₱187.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STO. DOMINGO, VIRAC, CATANDUANES, VI

Region V, Region V

2024₱187.5M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION OF DPWH REGIONAL OFFICE V BUILDING, RES COMPOUND, LEGAZPI CITY, ALBAY (PHASE 5), RES COMPOUND,LEGAZPI CITY, ALBAY(2ND LEGISLATIVE DISTRICT)

Region V, Region V

2023₱187.4M
Past target date (DPWH On-Going)
View all 555 projects →

4. Implementation

Contract Amount

₱34,103,712.56

Progress

Reported complete (DPWH)

Start Date

August 14, 2017

Target End

April 10, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayCity of LigaoTuburan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.