Roads18DD0444

CONCRETING OF BRGY. PIÑA FMR, BRGY. PIÑA, TAYSAN, BATANGAS

CONCRETING OF BRGY. PIÑA FMR, BRGY. PIÑA, TAYSAN, BATANGAS is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱4,923,863.00. Status: Reported complete (DPWH). Contractor on record: ACB BUILDERS AND TRADING. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱5,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-B-18-0016454 · ₱15,000,000 · release to the district office, not itemized per project

    Possible match · score 0.78

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18DD0444 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-04-18 → 2019-03-13

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BRGY. PIÑA FMR, BRGY. PIÑA, TAYSAN, BATANGAS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Rehabilitation of Drainage System, Brgy. Mataas na Lupa, Taysan, Batangas
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-B-18-0016454

₱15,000,000.00 · FY2018

Released to Regional Office - IVA (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

22 projects · ₱83.0M total · 0 flags

Other projects by this contractor

No sat.

VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF ROAD A) BRGY. BANAY-BANAY; B) BRGY. TAMBO; C) BRGY. SICO; D) BRGY. BAGONG POOK; E) BRGY. SAN SALVADOR, LIPA CITY, BATANGAS

Batangas 4th DEO, Region IV-A

2017₱14.8M
Reported complete (DPWH)
No sat.

VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF ROAD A) BRGY. ANTIPOLO DEL SUR; B) BRGY. PAGOLINGIN EAST; C) BRGY. PAGOLINGIN WEST; D) BRGY. PINAGKAWITAN, LIPA CITY, BATANGAS

Batangas 4th DEO, Region IV-A

2017₱12.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF TOW (2) STOREY FOUR (4) CLASSROOMS SCHOOL BUILDING AT IBAAN CS, BRGY. POBLACION, IBAAN, BATANGAS

Batangas 4th DEO, Region IV-A

2017₱9.1M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, LOCAL ROADS AND BRIDGES- LOCAL ROADS- CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONCRETING OF ROAD, BARANGAY PANGHAYAAN, IBAAN, BATANGAS

Batangas 4th DEO, Region IV-A

2019₱3.8M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, LOCAL ROADS AND BRIDGES- LOCAL ROADS- CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONCRETING OF ROAD, BARANGAY BAGO, IBAAN, BATANGAS

Batangas 4th DEO, Region IV-A

2019₱3.8M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, LOCAL ROADS AND BRIDGES- LOCAL ROADS - CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONCRETING OF ROAD, BARANGAY MABALOR, IBAAN, BATANGAS

Batangas 4th DEO, Region IV-A

2019₱3.8M
Reported complete (DPWH)
View all 22 projects →

4. Implementation

Contract Amount

₱4,923,863.00

Progress

Reported complete (DPWH)

Start Date

June 27, 2018

Target End

September 24, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.