Construction of Revetment24AD0045

Construction of Cabangaran Flood Control Structure, Santa, Ilocos Sur

Construction of Cabangaran Flood Control Structure, Santa, Ilocos Sur is a DPWH-tracked public work in SANTA (ILOCOS SUR), ILOCOS SUR, Region I. Reported contract value: ₱9,765,365.65. Status: Reported complete (DPWH). Contractor on record: M V SABALBURO CONST AND SUPPLY. Figures trace to sumbong.

SANTA (ILOCOS SUR), ILOCOS SUR, Region I
Region: Region I

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱10,000

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROI-24-0007423 · ₱1,864,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24AD0045 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2024-04-22 → 2025-05-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Ilocos Sur

Based on the coordinates published with the DPWH record and NOAH file IlocosSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Cabangaran Flood Control Structure, Santa, Ilocos Sur

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Cabangaran Flood Control Structure, Santa, Ilocos Sur
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROI-24-0007423

₱1,864,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROI-24-0007425

₱172,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROI-24-0018197

₱153,535.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

4. Implementation

Contract Amount

₱9,765,365.65

Progress

Reported complete (DPWH)

Start Date

May 7, 2024

Target End

July 27, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.