Buildings and Facilities18IK0110

CONST. OF MODIFIED DESIGN WITH PARAPET, 1-UNIT, 2-STOREY, EIGHT (8) CL. SCHOOL BLDG., BAKHAW NHS, DARAM, SAMAR

CONST. OF MODIFIED DESIGN WITH PARAPET, 1-UNIT, 2-STOREY, EIGHT (8) CL. SCHOOL BLDG., BAKHAW NHS, DARAM, SAMAR is a DPWH-tracked public work in Samar 2nd DEO, Region VIII. Reported contract value: ₱23,537,508.60. Status: Reported complete (DPWH). Contractor on record: RIANNE CONST. Figures trace to dpwh.

Samar 2nd DEO, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-18-0031970 · ₱171,788 · release to the district office, not itemized per project

    Possible match · score 0.77

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18IK0110 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-06-15 → 2025-09-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST. OF MODIFIED DESIGN WITH PARAPET, 1-UNIT, 2-STOREY, EIGHT (8) CL. SCHOOL BLDG., BAKHAW NHS, DARAM, SAMAR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Protection Works, Basey, Samar
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-18-0031970

₱171,788.00 · FY2018

Released to Eastern Samar District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱23,537,508.60

Progress

Reported complete (DPWH)

Start Date

January 15, 2019

Target End

June 13, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.