Roads24H00037

CSSP, SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHAB. OF DAMAGED PAVED ROAD AT CAMPALANAS-LOWER CABANGCALAN ROAD, LAZI, SIQUIJOR

CSSP, SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHAB. OF DAMAGED PAVED ROAD AT CAMPALANAS-LOWER CABANGCALAN ROAD, LAZI, SIQUIJOR is a DPWH-tracked public work in Region VII, Region VII. Reported contract value: ₱164,049,999.58. Status: Past target date (DPWH On-Going). Contractor on record: RKVT CONST. Figures trace to dpwh.

Region VII, Region VII
Region: Region VII

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

27 projects · ₱1.0B total · 0 flags

Other projects by this contractor

CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF ANDOON RIVER ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY ROAD (S00427NR), SAN CARLOS CITY, NEGROS OCCIDENTAL

Region VI, Region VI

2024₱144.8M
Reported complete (DPWH)

CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF ANDOON RIVER (UPSTREAM) ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY ROAD (S00427NR), SAN CARLOS CITY, NEGROS OCCIDENTAL

Region VI, Region VI

2024₱144.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM) AT CAMOGAO, EN

Siquijor DEO, Negros Island Region

2024₱96.5M
Past target date (DPWH On-Going)
No sat.

PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG JCT NATL RD SAGAY-BATO-DIAN-AY-MARCELO-BALEA JCT RD (S00426NR) - K0103 + 083 - K0104 + 000, K0112 + 000 - K0114 + 000, K0121 + 435 - K0122 + 106

Negros Occidental 5th DEO, Negros Island Region

2025₱96.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF MAGBABOY RIVER (SEGMENT 1), ALONG BACOLOD NORTH RD, SAN CARLOS CITY, NEGROS OCCIDENTAL

Negros Occidental 5th DEO, Negros Island Region

2025₱95.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF PALAMPAS RIVER (UPSTREAM AREA) ALONG BACOLOD NORTH RD (S00425NR), BRGY. PALAMPAS, SAN CARLOS CITY, NEGROS OCCIDENTAL

Region VI, Region VI

2024₱77.2M
Reported complete (DPWH)
View all 27 projects →

4. Implementation

Contract Amount

₱164,049,999.58

Progress

Past target date (DPWH On-Going)

Start Date

June 14, 2024

Target End

July 22, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.