CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF ANDOON RIVER (UPSTREAM) ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY ROAD (S00427NR), SAN CARLOS CITY, NEGROS OCCIDENTAL
CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF ANDOON RIVER (UPSTREAM) ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY ROAD (S00427NR), SAN CARLOS CITY, NEGROS OCCIDENTAL is a DPWH-tracked public work in Region VI, Region VI. Reported contract value: ₱144,750,000.00. Status: Reported complete (DPWH). Contractor on record: RKVT CONST. Figures trace to dpwh.
Total Contract Cost

