Buildings and Facilities17JG0325

CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOM ICT BUILDING AT PAULINO DARI NHS (BLDG. 1), PITOGO, ZAMBOANGA DEL SUR

CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOM ICT BUILDING AT PAULINO DARI NHS (BLDG. 1), PITOGO, ZAMBOANGA DEL SUR is a DPWH-tracked public work in Zamboanga del Sur 2nd DEO, Region IX. Reported contract value: ₱2,757,639.40. Status: Reported complete (DPWH). Contractor on record: ED1SON DEVELOPMENT. Figures trace to dpwh.

Zamboanga del Sur 2nd DEO, Region IX
Region: Region IX

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱45,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0005678 · ₱72,267 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17JG0325 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-02-21 → 2021-11-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,378,820 per classroom= 1.0x the Region IX median (n=269)

Contract cost ₱2,757,639 ÷ 2 classroom read from the DPWH title (“TWO (2) CLASSROOM”; classroom count in title). National percentile: 31. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOM ICT BUILDING AT PAULINO DARI NHS (BLDG. 1), PITOGO, ZAMBOANGA DEL SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱45,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Improvement /Rehabilitation/Repair of Sibuguey River Flood Control Project, Phase I, Poblacion, Bayog, Zamboanga del Sur
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0005678

₱72,267.00 · FY2017

Released to Division of Eastern Samar (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

4. Implementation

Contract Amount

₱2,757,639.40

Progress

Reported complete (DPWH)

Start Date

January 18, 2018

Target End

April 17, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.