CONSTRUCTION OF MODIFIED STANDARD DPWH - DEPED ONE (1) UNIT, TWO (2) STOREY, TWO (2) ICT LABORATORY, BAROTAC VIEJO NHS, BAROTAC VIEJO, ILOILO
CONSTRUCTION OF MODIFIED STANDARD DPWH - DEPED ONE (1) UNIT, TWO (2) STOREY, TWO (2) ICT LABORATORY, BAROTAC VIEJO NHS, BAROTAC VIEJO, ILOILO is a DPWH-tracked public work in Iloilo 3rd DEO, Region VI. Reported contract value: ₱10,104,560.79. Status: Reported complete (DPWH). Contractor on record: MASBATE-ILOILO CONST. Figures trace to dpwh.
Total Contract Cost
