DPWH projects in Iloilo
5,285 DPWH public works projects are recorded in Iloilo (Region Vi), with start dates from 2016 to 2025. Recorded contract values total about ₱80,123,325,445.04. 4,661 are recorded at 100% progress and 421 are flood control works. Figures are as recorded by DPWH; they are not findings.
Largest recorded projects
- Construction of Drainage System Within the Vicinity of City Proper Area ( Gen. Luna-Jalandoni-Rizal-J.M. Basa), Including Lapaz and Mandurriao, Iloilo City₱183,182,224.30
- Rehabilitation of Multi-Purpose Building, Northern Iloilo State University (Nisu), Sara, Iloilo₱148,424,519.31
- Construction of Seawall, Barangay Binon- An, Batad, Iloilo₱144,750,000.00
- Construction of Seawall, Barangay Poblacion, San Dionisio, Iloilo₱144,750,000.00
- Construction of Flood Mitigation Structure- Construction of Seawall, Barangay Bancal, Carles, Iloilo₱144,549,615.68
- Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay Maya, Balasan, Iloilo (Package 1)₱144,499,533.17
- Construction of Flood Mitigation Structure- Construction of Flood Control Structure, Barangay Mangorocoro, Ajuy, Iloilo₱143,583,836.90
- Construction of Flood Mitigation Structure- Construction of Flood Control Structure, Barangay Mangorocoro, Ajuy, Iloilo₱143,220,914.05
- Construction of Slope Protection Structure (Rockfall Netting) Along Panay East-West Lateral Road Package 3, Iloilo₱142,337,500.00
- Construction of Slope Protection Structure (Rockfall Netting) Along Panay East-West Lateral Road Package 1, Iloilo₱142,337,500.00
- Construction of Slope Protection Structure (Rockfall Netting) Along Panay East-West Lateral Road Package 2, Iloilo₱142,337,500.00
- Construction of Flood Mitigation Structure Along Jalaur River(Package 3), Calinog, Iloilo₱140,180,000.00
- Construction of Flood Mitigation Structure, Oton, Iloilo₱139,790,115.94
- Construction of Flood Mitigation Structure, Tigbauan, Iloilo₱139,780,813.35
- Construction of Flood Mitigation Structure, Miagao, Iloilo₱139,776,447.08
- Construction of Flood Mitigation Structure, San Joaquin, Iloilo₱139,773,579.20
- Street Lighting Along Iloilo - Capiz (Old Route) - K0019+(638)-K0035+000₱137,509,000.00
- Street Lighting Along Iloilo - Capiz (New Route) - K0022+(-378) - K0029+1217₱137,489,100.00
- Preventive Maintenance of Road: Asphalt Overlay - Iloilo East Coast-Capiz Rd - K0286 + 280 - K0288 + 124₱130,149,999.84
- Construction of Concrete Road - Balasan Diversion Rd, Balasan, Package 1, Iloilo₱130,102,173.97
- Construction of Concrete Bridge- Barotac Viejo Bypass Road, Barotac Viejo, Iloilo₱130,074,999.93
- Preventive Maintenance of Road: Asphalt Overlay - Iloilo - Capiz (New Route) - K0042 + 325 - K0043 + 745, K0044 + 501 - K0046 + 213₱124,809,999.99
- Preventive Maintenance of Road: Asphalt Overlay - Pototan - Tina - Lambunao Rd - K0043 + 671 - K0046 + 863, K0048 + 159 - K0050 + 573, K0055 + 000 - K0055 + 1379₱124,799,996.37
- Construction of River Control Structure Along Ulian River in DueñAs, Iloilo (Package B)₱123,649,498.40
- Construction of River Control Structure Along Tigum River in Maasin, Iloilo (Package B)₱123,599,770.36