Roads25GG0072

PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - POTOTAN - TINA - LAMBUNAO RD - K0043 + 671 - K0046 + 863, K0048 + 159 - K0050 + 573, K0055 + 000 - K0055 + 1379

PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - POTOTAN - TINA - LAMBUNAO RD - K0043 + 671 - K0046 + 863, K0048 + 159 - K0050 + 573, K0055 + 000 - K0055 + 1379 is a DPWH-tracked public work in Iloilo 6th DEO, Region VI. Reported contract value: ₱124,799,996.37. Status: Past target date (DPWH On-Going). Contractor on record: IBC INTERNATIONAL BUILDERS CORP. Figures trace to dpwh.

Iloilo 6th DEO, Region VI
Region: Region VI

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.78

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25GG0072 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    96% reported · imagery 2015-04-29 → 2025-10-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱21,730,802 per km= 1.2x the Region VI median (n=221)

Contract cost ₱124,799,996 ÷ 5.743 km read from the DPWH title (“K0043 + 671 - K0046 + 863; K0048 + 159 - K0050 + 573; K0055 + 000 - K0055 + 137”; K-post / station range length). National percentile: 39. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - POTOTAN - TINA - LAMBUNAO RD - K0043 + 671 - K0046 + 863, K0048 + 159 - K0050 + 573, K0055 + 000 - K0055 + 1379

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 78%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures within Iloilo City Waterways and Coastal Protection (Section 11)
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Iloilo 6th DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

4. Implementation

Contract Amount

₱124,799,996.37

Progress

Past target date (DPWH On-Going)

Start Date

March 4, 2025

Target End

July 25, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)IloiloLambunaoBinaba-an Armada
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.