GAA 2024 OO-124GI0105

PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO EAST COAST-CAPIZ RD - K0286 + 280 - K0288 + 124

PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO EAST COAST-CAPIZ RD - K0286 + 280 - K0288 + 124 is a DPWH-tracked public work in Iloilo 4th DEO, Region VI. Reported contract value: ₱130,149,999.84. Status: Past target date (DPWH On-Going). Contractor on record: MAC BUILDERS CORP FORMERLY: MAC BUILDERS DEVELOPMENT CORP. Figures trace to dpwh.

Iloilo 4th DEO, Region VI
Region: Region VI

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱99,500 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-D-24-0004657 · ₱444,435,636 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24GI0105 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    81% reported · imagery 2022-11-29 → 2022-11-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱70,580,260 per km= 4.1x the Region VI median (n=221)

Contract cost ₱130,150,000 ÷ 1.844 km read from the DPWH title (“K0286 + 280 - K0288 + 124”; K-post / station range length). National percentile: 92. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO EAST COAST-CAPIZ RD - K0286 + 280 - K0288 + 124

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱99,500,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Aganan Flood Control Structure ( Jaro - Aganan River ) , Barangay Balabago, Alimodian, Iloilo
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-D-24-0004657

₱444,435,636.00 · FY2024

Released to General Headquarters - Proper (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱130,149,999.84

Progress

Past target date (DPWH On-Going)

Start Date

July 9, 2024

Target End

July 20, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO EAST COAST-CAPIZ RD - K0286 + 280 - K0288 + 124.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/18f3a8f3-9e6a-463b-b353-f909b950a027

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)IloiloZarragaGines
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.