Flood Control and Drainage24CC0094

CONSTRUCTION OF REINFORCED CONCRETE SLOPE REVETMENT AT BARANGAY SULIVAN, BALIUAG, BULACAN

CONSTRUCTION OF REINFORCED CONCRETE SLOPE REVETMENT AT BARANGAY SULIVAN, BALIUAG, BULACAN is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱48,999,934.25. Status: Reported complete (DPWH). Contractor on record: S-ANG CONST & GEN TRADING INC 37149. Figures trace to dpwh.

Bulacan 1st DEO, Region III
Region: Region III

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Bulacan 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 37149

21 projects · ₱2.9B total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-MADELLA-DINADIAWAN ROAD, PROVINCE OF AURORA

Region III, Region III

2023₱347.1M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS, BALER CEMENTO VIA DICOLUYUNGAN ROAD, PROVINCE OF AURORA

Region III, Region III

2023₱302.9M
Reported complete (DPWH)
No sat.

ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS - MAINTENANCE AND UPGRADING OF ACTIVE TRANSPORT INFRASTRUCTURE PHASE II

National Capital Region, National Capital Region

2022₱146.0M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY TAMOGONG, (BAIS BRI

Negros Oriental 2nd DEO, Negros Island Region

2025₱141.5M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CANLUMBOG RIVER, BAIS CITY, NE

Negros Oriental 2nd DEO, Negros Island Region

2025₱141.2M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BATANG RIVER, BARANGAY LUMBANG

Negros Oriental 2nd DEO, Negros Island Region

2025₱141.2M
Past target date (DPWH On-Going)
View all 21 projects →

4. Implementation

Contract Amount

₱48,999,934.25

Progress

Reported complete (DPWH)

Start Date

March 20, 2024

Target End

November 14, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.