Roads23C00007

ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-MADELLA-DINADIAWAN ROAD, PROVINCE OF AURORA

ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-MADELLA-DINADIAWAN ROAD, PROVINCE OF AURORA is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱347,109,898.08. Status: Past target date (DPWH On-Going). Contractor on record: S-ANG CONST & GEN TRADING INC. Figures trace to dpwh.

Region III, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2023 GAA. DBM GAA FY2023

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

24 projects · ₱2.9B total · 2 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS, BALER CEMENTO VIA DICOLUYUNGAN ROAD, PROVINCE OF AURORA

Region III, Region III

2023₱302.9M
Reported complete (DPWH)
No sat.

ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS - MAINTENANCE AND UPGRADING OF ACTIVE TRANSPORT INFRASTRUCTURE PHASE II

National Capital Region, National Capital Region

2022₱146.0M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY TAMOGONG, (BAIS BRI

Negros Oriental 2nd DEO, Negros Island Region

2025₱141.5M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CANLUMBOG RIVER, BAIS CITY, NE

Negros Oriental 2nd DEO, Negros Island Region

2025₱141.2M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BATANG RIVER, BARANGAY LUMBANG

Negros Oriental 2nd DEO, Negros Island Region

2025₱141.2M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM), BARANGAY LUYANG,

Negros Oriental 2nd DEO, Negros Island Region

2025₱141.1M
Past target date (DPWH On-Going)
View all 24 projects →

4. Implementation

Contract Amount

₱347,109,898.08

Progress

Past target date (DPWH On-Going)

Start Date

October 2, 2023

Target End

May 24, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.