CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINABAKOD RIVER (LEFT AND RIGHT BANK), DOWNSTREAM OF CHECK GATE, LA PAZ, TARLAC
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINABAKOD RIVER (LEFT AND RIGHT BANK), DOWNSTREAM OF CHECK GATE, LA PAZ, TARLAC is a DPWH-tracked public work in Tarlac 2nd DEO, Region III. Reported contract value: ₱96,499,276.08. Status: Reported complete (DPWH). Contractor on record: ROYAL CROWN MONARCH CONST. Figures trace to dpwh.
Total Contract Cost
