LOCAL PROGRAM: CONSTRUCTION OF BARANGAY PERMANENT EVACUATION HOLDING CENTER, BRGY. IMPERIAL COURT, LEGAZPI CITY, ALBAY

LOCAL PROGRAM: CONSTRUCTION OF BARANGAY PERMANENT EVACUATION HOLDING CENTER, BRGY. IMPERIAL COURT, LEGAZPI CITY, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱4,899,814.52. Status: Past target date (DPWH On-Going). Contractor on record: CBC CONST. Figures trace to dpwh.

Albay 2nd DEO, Region V
Region: Region V

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-19-0019722

₱241,576.00 · FY2019

Released to Division of Davao del Norte (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

87 projects · ₱1.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-ROAD SAFETY FEATURES/DEVICES ALONG NATIONAL ROADS AND BRIDGES-INSTALLATION OF SOLAR STREET LIGHTS ALONG DAANG MAHARLIKA (LZ)-K0555+699-K0571+556

Region V, Region V

2024₱141.1M
Past target date (DPWH On-Going)
No sat.

CSSP:SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ILAWODLIGBAN ROAD DIKE TRIBUTARY CHANNEL, PACKAGE 2, CAMALIG

Albay 2nd DEO, Region V

2024₱93.6M
Past target date (DPWH On-Going)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DIKE ALONG BARIW TRIBUTARY CHANNEL, PACKAGE 2, CAMALIG, ALBAY

Albay 2nd DEO, Region V

2024₱93.6M
Past target date (DPWH On-Going)
No sat.

OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF CAGSAWA FLOOD MITIGATION STRUCTURE ALONG TRIBUTARIES OF BARANGAY BUDIAO TO BARANGAY

Albay 2nd DEO, Region V

2024₱93.6M
Past target date (DPWH On-Going)
No sat.

CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TAGAYTAY-LIBOD ROAD, CAMALIG, ALBAY

Albay 2nd DEO, Region V

2024₱93.6M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG):ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SAN JOAQUIN-PAWA-BOGTONG ROAD LEADING TO LEGAZPI CITY AIRPORT,LEGAZPI,

Albay 2nd DEO, Region V

2024₱91.7M
Past target date (DPWH On-Going)
View all 87 projects →

4. Implementation

Contract Amount

₱4,899,814.52

Progress

Past target date (DPWH On-Going)

Start Date

May 22, 2019

Target End

September 18, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.