Flood Control and Drainage25AA0139

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BARANGAY CANAAM, VINTAR, ILOCOS NORTE

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BARANGAY CANAAM, VINTAR, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱28,224,632.92. Status: Reported complete (DPWH). Contractor on record: JC-08 BUILDERS CORP. Figures trace to dpwh.

Ilocos Norte 1st DEO, Region I
Region: Region I

Follow the peso

2 of 5 steps linked from public records. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱30,000

    Probable match · score 0.91

    DBM GAA source ↗
  2. 2. SARO / NCA release

    Not yet linked

  3. 3. PhilGEPS award

    Not yet linked

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-11-13 → 2022-11-13

    Same record (DPWH contract ID)

    DPWH source ↗
  5. 5. COA audit finding

    Not yet linked

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Ilocos Norte

Based on the coordinates published with the DPWH record and NOAH file IlocosNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Money Trail

1. Appropriation

Probable match · score 91%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Bislak River, Barangay Canaam, Vintar, Ilocos Norte
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Ilocos Norte 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

124 projects · ₱684.4M total · 0 flags

Other projects by this contractor

No sat.

BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, PASALENG BR. 1 (B04937LZ) ALONG MANILA NORTH RD

Ilocos Norte 1st DEO, Region I

2025₱23.7M
Past target date (DPWH On-Going)
No sat.

SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD, CARASI, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2024₱18.8M
Reported complete (100% progress, DPWH status On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD AT BARANGAYS BANI, DURIPES AND CABUSLIGAN, BACARRA, ILOCOS NOR

Ilocos Norte 1st DEO, Region I

2025₱12.1M
Reported complete (100% progress, DPWH status On-Going)
No sat.

SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD, BARANGAY 17 SAN FRANCISCO, LAOAG CITY, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2024₱9.8M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, SITIO SINAGBAN, BARANGAY CABANGARAN, VINTAR, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2025₱9.6M
Past target date (DPWH On-Going)
No sat.

BIP - ACCESSROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADINGTO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES -IMPROVEMENT OF ROAD, BARANGAY 56-A BACSIL NORTH, LAOAGCITY, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2024₱9.6M
Past target date (DPWH On-Going)
View all 124 projects →

4. Implementation

Contract Amount

₱28,224,632.92

Progress

Reported complete (DPWH)

Start Date

April 8, 2025

Target End

October 13, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.