REPAIR/ REHABILITATION OF MANAT BRIDGE 2 (B02148LZ) ALONG PANGASINAN-ZAMBALES ROAD
REPAIR/REHABILITATION OF MANAT BRIDGE 2 (B02148LZ) ALONG PANGASINAN-ZAMBALES ROAD is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱25,273,350.00. Status: Past target date (DPWH On-Going). Contractor on record: ALPHATEC CHEMICAL CORP. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
