ALPHATEC CHEMICAL CORP is listed as a company organization in Philippine public procurement records on this site, with 531 linked DPWH project(s) totaling about ₱13,285,375,258.75. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
ALPHATEC CHEMICAL CORP
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 531
- Total value
- ₱13,285,375,258.75
- Published flags
- 0
- Region
- Region I · Region I
Licensed officers (PCAB)
- Rolando Malquisto Romero · Authorized Managing Officer (PCAB license 39938) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ALPHATEC CHEMICAL CORP — not an accusation or finding of wrongdoing.
Score: 84.60 / 100 · Projects in sample: 531 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 71.5/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 71.5
- lateCompletedProjects
- 18
- onTimeCompletedProjects
- 409
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 506
- pastTargetOngoingProjects
- 79
- undatedCompletedProjectsExcluded
- 25
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 531
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 531
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 531
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 531
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 527 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - NARCISO RAMOS BR. (B01626LZ) ALONG BINALONAN-ASINGAN-SANTA MARIA RD (PHASE III)25A00074 · ₱234,012,500.00 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MANILA NORTH RD - K0565 + 850 - K0565+865, K0572+465 - K0572+540, K0578+380 - K0578+390, K0578+711 - K0578+85525A00118 · ₱203,641,970.36 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, MANILA NORTH RD - K0576+196-K0576+326 (RS), K0576+590-K0576+636 (RS), K0576+1137-K0576+1173 (RS)23A00236 · ₱159,222,343.22 · mapped
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, DOMALANDAN BR. (B00896LZ) ALONG LINGAYEN-LABRADOR DIV RD (PHASE III)24A00003 · ₱149,029,025.72 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - EDSA\KAMUNING FLYOVER (SB) (B02334LZ) ALONG EDSA\KAMUNING FLYOVER24O00004 · ₱145,715,000.00 · mapped
- BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-SAN AGUSTIN BRIDGE (BO1482LZ) ALONG JOSE ABAD SANTOS AVENUE (JASA), PROVINCE OF PAMPANGA23C00047 · ₱144,747,735.76 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - BATASAN - SAN MATEO BR. (B05081LZ) ALONG IBP - SAN MATEO RD, QUEZON CITY25OF0130 · ₱141,856,187.00 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ARINGAY BR. (B02638LZ) ALONG MANILA NORTH RD23A00031 · ₱141,372,457.50 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, GILBERT BR. 2 (B00842LZ) ALONG MANILA NORTH RD.25A00013 · ₱140,407,500.00 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, BAGBAG BR. 2 (B00813LZ) ALONG LAOAG-SARRAT-PIDDIG-SOLSONA RD25A00016 · ₱140,407,500.00 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, GILBERT BR. 1 (B00897LZ) ALONG MANILA NORTH RD.25A00014 · ₱140,407,500.00 · mapped
- RETROFITTING / STRENGTHENING OF BRIDGE - BATASAN - SAN MATEO BR. (B05081LZ) ALONG IBP - SAN MATEO RD, QUEZON CITY24OF0157 · ₱130,574,269.00 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, NAGUILIAN BR. (B00667LZ) ALONG BAUANG-BAGUIO RD23A00008 · ₱129,791,706.85 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, STA. MARIA CENTENNIAL BR.(B00628LZ) ALONG MANILA NORTH RD24A00151 · ₱123,519,985.19 · mapped
- REPAIR AND REHABILITATION OF VARIOUS BRIDGES DAMAGED/ CAUSED BY MAGNITUDE 7.3 EARTHQUAKE IN REGION I - REPAIR/REHABILITATION OF PATAPAT VIADUCT (B00547LZ) ALONG MANILA NORTH RD22A00325 · ₱115,799,928.50 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - HECTOR MENDOZA BR. (B03217LZ) ALONG CARMEN JCT-MANAT RD (PHASE IV)25A00044 · ₱115,695,780.00 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - HECTOR MENDOZA BR. (B03217LZ) ALONG CARMEN JCT-MANAT RD. (PHASE II)23A00033 · ₱106,142,793.55 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, HECTOR MENDOZA BRIDGE (B03217LZ) ALONG CARMEN JCT - MANAT ROAD22A00001 · ₱101,325,000.00 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, BAGULIN BR.(B05052LZ) ALONG SN FERNANDO - BAGULIN RD25A00083 · ₱101,093,400.00 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, BOLO BR. (B00541LZ) ALONG MANILA NORTH RD24A00171 · ₱100,906,190.00 · mapped
- BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, MABALACAT-BAMBAN BRIDGE (BO1953LZ) ALONG MANILA NORTH ROAD (PHASE II), PROVINCE OF PAMPANGA21C00019 · ₱100,312,792.53 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, ALORAGAT BR. (B00731LZ) ALONG MANILA NORTH RD24A00084 · ₱98,428,692.30 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, BANILA BR.(B00850LZ) ALONG SN NICOLAS-NATIVIDAD-SN QUINTIN-UMINGAN-GUIMBA RD25A00070 · ₱97,817,225.00 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, SINAPOG BR. (B01624LZ) ALONG BINALONAN-ASINGAN-SANTA MARIA RD24A00321 · ₱96,499,988.55 · mapped
- BRIDGE PROGRAM-REHAB./MAJOR REPAIR OF PERMANENT BRIDGES: 1.)BALIUAG FLYOVER (BO1656LZ) ALONG BALIUAG FLYOVER, AND 2.) BOCAUE FLYOVER (BO3379LZ) ALONG BOCAUE FLYOVER, PROVINCE OF BULACAN25C00481 · ₱95,564,870.47 · mapped
- REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - BENIGNO AQUINO BR. (B02367LZ) ALONG DEL MONTE AVE., QUEZON CITY23OF0090 · ₱94,092,744.32 · mapped
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, CALVO BR. (B02765LZ) ALONG CARMEN JCT - BAYAMBANG - MANAT RD24A00236 · ₱93,122,481.00 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - DOMALANDAN BR. (B00896LZ) ALONG LINGAYEN-LABRADOR DIV. RD (PHASE II)23A00032 · ₱91,674,689.80 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MACULCOL BR. (B01393LZ) ALONG OLONGAPO-BUGALLON RD, SAN NARCISO, ZAMBALES22CL0002 · ₱91,491,241.00 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, BANBAN BR. (B04483LZ) ALONG MANILA NORTH RD24A00149 · ₱91,264,875.00 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, BUCAO BR. (B00040LZ) ALONG OLONGAPO-BUGALLON RD, BOTOLAN, ZAMBALES22CL0008 · ₱87,092,774.43 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, BARUYEN BR. (B04482LZ) ALONG MANILA NORTH RD24A00135 · ₱85,742,180.00 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, BUED BRIDGE (B00735LZ) ALONG MANILA NORTH ROAD22A00006 · ₱84,920,000.00 · mapped
- SABANGAN BR. (B01414LZ) ALONG CLAVERIA-CALANASAN-KABUGAO RD25P00007 · ₱84,240,818.34 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, AMBURAYAN BR. (B00598LZ) ALONG MANILA NORTH RD24A00148 · ₱81,542,500.00 · mapped
- RETROFITTING/STRENGTHENING OF BRIDGE, GABOR BR. (B01395LZ) ALONG OLONGAPO-BUGALLON ROAD, SAN FELIPE, ZAMBALES19CL0011 · ₱77,910,236.89 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, VIRAY BR.(B00844LZ) ALONG SN NICOLAS-NATIVIDAD-SN QUINTIN-UMINGAN-GUIMBA RD25A00062 · ₱77,224,125.00 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - MAGAT BR. (B01150LZ) ALONG SANTIAGO-TUGUEGARAO RD, SARANAY, AURORA, ISABELA23BF0042 · ₱77,199,982.50 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES,MACULCOL BR. (B01393LZ), SAN NARCISO,ZAMBALES21CL0002 · ₱77,197,399.41 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, PADSAN BR. (B04969LZ) ALONG RODOLFO G. FARINAS BYPASS RD24A00264 · ₱76,756,100.00 · mapped
- RETROFITTING/STRENGTHENING OF BUCAYAO BRIDGE, CALAPAN, ORIENTAL MINDORO25ED0128 · ₱76,714,486.35 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MANILA NORTH RD - K0578 + 640 - K0578 + 71125A00121 · ₱74,884,251.99 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, BARORO BRIDGE (B02651LZ) ALONG MANILA NORTH ROAD22A00021 · ₱72,375,000.00 · mapped
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - LIBIS BR. (SB) (B02676LZ) ALONG E RODRIGUEZ JR AVE, QUEZON CITY24OG0058 · ₱72,372,077.78 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, DEPALO BR. 1(B00845LZ) ALONG SN NICOLAS-NATIVIDAD-SN QUINTIN-UMINGAN-GUIMBA RD25A00063 · ₱69,642,120.00 · mapped
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - LIBIS BR. (NB) (B02675LZ) ALONG E. RODRIGUEZ JR AVE QUEZON CITY24OG0057 · ₱69,484,277.51 · mapped
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, BUGALLON BR. (B02143LZ) ALONG PANGASINAN-ZAMBALES RD (PHASE III)24A00002 · ₱68,708,000.00 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, BAGBAG BR. 3 (B00814LZ) ALONG LAOAG-SARRAT-PIDDIG-SOLSONA RD25A00017 · ₱68,153,800.50 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - NARCISO RAMOS BR. (B01626LZ) ALONG BINALONAN-ASINGAN-SANTA MARIA RD. (PHASE II)23A00046 · ₱67,549,995.00 · mapped
- BRIDGE PROGRAM RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES AGANA BR. (B00098LZ) ALONG ROMULO H-WAY23CJ0053 · ₱67,058,588.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 39938
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Jan 25, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 39938); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
29 evaluations listed across 7 GPPB CPES releases; average final rating 94.8% over 13 rated projects; 28 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jul 26, 2025 | DPWH | ₱28,795,949.00 | On-going | 90.4% | — | 40th, p. 29 |
| Jul 22, 2025 | DPWH | ₱42,301,694.00 | On-going | 94.8% | — | 40th, p. 28 |
| Jul 22, 2025 | DPWH | ₱203,641,970.00 | On-going | 96.1% | — | 40th, p. 28 |
| May 7, 2025 | DPWH | ₱47,147,195.00 | On-going | 93.3% | — | 40th, p. 29 |
| Apr 30, 2025 | DPWH | ₱130,514,290.00 | Completed | 100.0% | 97.7% | 40th, p. 28 |
| Apr 29, 2025 | DPWH | ₱18,721,000.00 | On-going | 95.4% | — | 40th, p. 28 |
| Mar 11, 2025 | DPWH | ₱149,029,025.00 | Completed | 93.4% | 92.6% | 40th, p. 28 |
| Mar 7, 2025 | DPWH | ₱145,715,000.00 | Completed | 93.8% | 94.5% | 39th (rev), p. 21 |
| Nov 28, 2024 | DPWH | ₱72,372,078.00 | Completed | 99.3% | 96.7% | 39th (rev), p. 21 |
| Oct 22, 2024 | DPWH | ₱38,222,757.00 | Completed | 96.1% | 96.1% | 39th (rev), p. 20 |
| Oct 16, 2024 | DPWH | ₱130,574,269.00 | On-going | 96.1% | — | 39th (rev), p. 21 |
| Jul 27, 2024 | DPWH | ₱69,490,400.00 | On-going | 94.9% | — | 38th, p. 21 |
Showing the 12 most recent of 29.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 582 awards · ₱14,668,484,083.53
- Province of Quezon Infrastructure: 1 award · ₱27,240,328.62
- DPWH Goods & services: 4 awards · ₱19,564,469.41
- Subic Bay Metropolitan Authority Goods & services: 2 awards · ₱495,000.00
- 25A00040
- 25A00039
- Contract ID No. 25OB0220 - Retrofitting/Strength₱19,657,030.97· 2025-12-03· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 1ST E
- Retrofitting of School Building - La Huerta₱18,913,733.21· 2025-07-25· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 2ND D
- 25C00499₱15,926,965.32· 2025-05-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION III
- 25EI0177- Retrofitting / Strengthening of Permanen₱42,675,557.27· 2025-05-22· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTHERN MINDORO D
- 25ED0128 - Retrofitting/Strengthening of Bucayao B₱76,714,486.35· 2025-05-14· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MINDORO ORIENTAL D
- 25ED0129 - Retrofitting/Strengthening of Pula Brid₱42,301,694.29· 2025-05-13· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MINDORO ORIENTAL D
- 25ED0130 - Retrofitting/Strengthening of Nagpantay₱19,390,299.75· 2025-05-13· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MINDORO ORIENTAL D
- 25EI0178-Retrofitting / Strengthening of Permanent₱24,100,356.00· 2025-05-13· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTHERN MINDORO D
- 25EI0179-Retrofitting / Strengthening of Permanent₱28,795,949.47· 2025-05-13· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - SOUTHERN MINDORO D
- 25ED0131 - Retrofitting/Strengthening of Canubing₱24,240,298.63· 2025-05-13· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MINDORO ORIENTAL D
- 25A00122
- 25A00121
- 24A00679
- 24A00681
- 24A00678
- 25A00118
- 25C00481₱95,564,870.47· 2025-03-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION III
- 25C00482₱40,620,756.56· 2025-03-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION III
- 25C00483₱19,121,129.52· 2025-03-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION III
- Retrofitting of School Building₱14,185,498.31· 2025-03-25· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 2ND D
- 25D00044₱9,360,261.76· 2025-03-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-A
- 25D00042₱7,488,406.92· 2025-03-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-A
- 25D00043₱7,488,770.52· 2025-03-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION IV-A
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →