RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, VIRAY BR.(B00844LZ) ALONG SN NICOLAS-NATIVIDAD-SN QUINTIN-UMINGAN-GUIMBA RD
RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, VIRAY BR.(B00844LZ) ALONG SN NICOLAS-NATIVIDAD-SN QUINTIN-UMINGAN-GUIMBA RD is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱77,224,125.00. Status: Past target date (DPWH On-Going). Contractor on record: ALPHATEC CHEMICAL CORP. Figures trace to dpwh.
Total Contract Cost

