CLUSTER III-CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) 1.ABONGAN NHS,BGY. ABONGAN,TAYTAY 2.BINUAN ES,BGY. LIBERTAD TAYTAY 3.BATO CS, BGY.BATO TAYTAY 4.BATO NHS,BGY.BATO,TAYTAY 5.PORT BARTON NHS,BGY. PORT BARTON SAN VICENTE 6.MANLAG ES BGY.MANLAG
CLUSTER III-CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) 1.ABONGAN NHS,BGY. ABONGAN,TAYTAY 2.BINUAN ES,BGY. LIBERTAD TAYTAY 3.BATO CS, BGY.BATO TAYTAY 4.BATO NHS,BGY.BATO,TAYTAY 5.PORT BARTON NHS,BGY. PORT BARTON SAN VICENTE 6.MANLAG ES BGY.MANLAG is a DPWH-tracked public work in Palawan 1st DEO, Region IV-B. Reported contract value: ₱1,101,512.79. Status: Reported complete (DPWH). Contractor on record: LEA. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost