Roads15AG0142No coordinates published by DPWH

CONCRETING OF ROAD AT LUCERO, BOLINAO, PANGASINAN

CONCRETING OF ROAD AT LUCERO, BOLINAO, PANGASINAN is a DPWH-tracked public work in Pangasinan 1st DEO, Region I. Reported contract value: ₱2,328,328.00. Status: Reported complete (DPWH). Contractor on record: JONIK TRADING. Figures trace to dpwh.

Pangasinan 1st DEO, Region I

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region I

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱2,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-16-0019498 · ₱262,169 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 15AG0142 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF ROAD AT LUCERO, BOLINAO, PANGASINAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control/Drainage Cayambanan, Urdaneta City, Pangasinan 5th LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-16-0019498

₱262,169.00 · FY2016

Released to 000 - National Mapping and Resource Information AuthoTo cover (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

415 projects · ₱3.3B total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION/CONSTRUCTION OF ROADS, CITY OF ALAMINOS, PANGASINAN

Pangasinan 1st DEO, Region I

2025₱98.0M
Past target date (DPWH On-Going)

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES IN BALINGCAGUING RIVER (POBLACION EAST SECTION), BRGY. POBLACION EAST, AGNO, PANGASINAN

Pangasinan 1st DEO, Region I

2025₱94.6M
Reported complete (DPWH)
No sat.

PREVENTIVE MAINTENANCE, PANGASINAN-ZAMBALES RD - K0284+000 - K0285+000, K0299+000 - K0300+000, K0321+000 - K0323+000, K0325+088 - K0325+300, K0326+400 - K0327+034, K0327+228 - K0328+000, K0329+000 - K0329+240.9

Region I, Region I

2019₱61.8M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - RECONSTRUCTION OF MULTI-PURPOSE BUILDING, DON RAYMUNDO CELESTE SPORTS COMPLEX, BARANGAY GERMINAL, BOLINAO, PANGASINAN

Pangasinan 1st DEO, Region I

2023₱49.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - ALAMINOS - BOLINAO RD - K0322 + 328 - K0323 + 793 AT BARANGAY POGO, ALAMINOS CITY, PANGASINAN

Pangasinan 1st DEO, Region I

2024₱42.7M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - ALAMINOS - BOLINAO RD - K0337 + 000 - K0339 + 632, K0340 + 530 - K0341 + 822 AT BANI, PANGASINAN

Pangasinan 1st DEO, Region I

2023₱40.2M
Reported complete (DPWH)
View all 415 projects →

4. Implementation

Contract Amount

₱2,328,328.00

Progress

Reported complete (DPWH)

Start Date

January 14, 2016

Target End

March 3, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.