Buildings and Facilities19AG0249

CONSTRUCTION OF MODIFIED STANDARD FOUR-STOREY (8 CLASSROOMS) SCHOOL BUILDING AT BOLINAO INTEGRATED SCHOOL, BOLINAO PANGASINAN

CONSTRUCTION OF MODIFIED STANDARD FOUR-STOREY (8 CLASSROOMS) SCHOOL BUILDING AT BOLINAO INTEGRATED SCHOOL, BOLINAO PANGASINAN is a DPWH-tracked public work in Pangasinan 1st DEO, Region I. Reported contract value: ₱20,446,471.96. Status: Reported complete (DPWH). Contractor on record: RAMDC CONST AND TRADING. Figures trace to dpwh.

Pangasinan 1st DEO, Region I
Region: Region I

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROIX-19-0020532 · · release to the district office, not itemized per project

    Possible match · score 0.75

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19AG0249 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-06-18 → 2025-10-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MODIFIED STANDARD FOUR-STOREY (8 CLASSROOMS) SCHOOL BUILDING AT BOLINAO INTEGRATED SCHOOL, BOLINAO PANGASINAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIX-19-0020532

₱0.00 · FY2019

Released to Zamboanga Sibugay National High School (Pangi NHS) (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

119 projects · ₱1.5B total · 0 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES IN BALINCAGUING RIVER (BANGAN-ODA SECTION II), BRGY. BANGAN ODA, AGNO, PANGASINAN

Pangasinan 1st DEO, Region I

2025₱94.6M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROGRAM ALLEVIATING GAPS(SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRIDGE CONNECTING SANTIAGO ISLAND TO BOLINAO(PACKAGEB)BOLINAO,PANGASINAN

Pangasinan 1st DEO, Region I

2024₱94.5M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT-ROAD WIDENING-BANI-AGNO RD(KO342+790-KO345+300) AT AGNO, PANGASINAN

Pangasinan 1st DEO, Region I

2019₱77.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVE PARK, BRGY. BUED, ALAMINOS CITY, PANGASINAN PACKAGE II

Pangasinan 1st DEO, Region I

2023₱53.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVE PARK, BRGY. BUED, ALAMINOS CITY, PANGASINAN PACKAGE III

Pangasinan 1st DEO, Region I

2023₱53.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVE PARK, BRGY. BUED, ALAMINOS CITY, PANGASINAN PACKAGE IV

Pangasinan 1st DEO, Region I

2023₱48.2M
Reported complete (DPWH)
View all 119 projects →

4. Implementation

Contract Amount

₱20,446,471.96

Progress

Reported complete (DPWH)

Start Date

September 3, 2019

Target End

February 29, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.