Buildings and Facilities17CI0055No coordinates published by DPWH

LFP;LIP;BUILDING AND OTHER STRUCTURES,SCHOOL BUILDING,CONST OF CLASSROOM STO DOMINGO INTEGRATED SCHO

LFP;LIP;BUILDING AND OTHER STRUCTURES,SCHOOL BUILDING,CONST OF CLASSROOM STO DOMINGO INTEGRATED SCHO is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱4,751,384.39. Status: Reported complete (DPWH). Contractor on record: R G DIAZ BUILDERS. Figures trace to dpwh.

Pampanga 3rd DEO, Region III

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-D-17-0021650 · ₱8,957,832 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17CI0055 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LFP;LIP;BUILDING AND OTHER STRUCTURES,SCHOOL BUILDING,CONST OF CLASSROOM STO DOMINGO INTEGRATED SCHO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Facilities at Alassas Creek, Sta. Cruz, Magalang, Pampanga
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-D-17-0021650

₱8,957,832.00 · FY2017

Released to 00000 - Supreme Court of To cover he Philippines and the Lower reti ourts (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

279 projects · ₱1.7B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES STRUCTURAL AND RESILIENCE PROGRAM - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (DAR REGIONAL OFFICE BUILDING), CITY OF SAN FERNANDO, PAMPA

Pampanga 1st DEO, Region III

2024₱47.5M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION/ COMPLETION OF MULTI-PURPOSE BUILDING PHASE II, STA. ANA, PAMPANGA

Pampanga 1st DEO, Region III

2024₱47.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVENTION CENTER), STA. ANA, PAMPANGA

Pampanga 1st DEO, Region III

2023₱37.7M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REPAIR / REHABILITATION OF ERODED PAMPANGA RIVER BANK (LANDSLIDE SECTION) (PHASE 1)

Pampanga 1st DEO, Region III

2025₱28.4M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/ REHABILITATION OF CABETICAN CREEK, BACOLOR, PAMPANGA (R.A. 9506- BACOLOR REHABILITATION ACT)

Pampanga 1st DEO, Region III

2019₱27.9M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF JASA - MEXICO - MAGALANG ROAD, MEXICO, PAMPANGA

Pampanga 1st DEO, Region III

2024₱25.7M
Reported complete (DPWH)
View all 279 projects →

4. Implementation

Contract Amount

₱4,751,384.39

Progress

Reported complete (DPWH)

Start Date

June 20, 2017

Target End

November 16, 2017

5. Audit