Flood Control and Drainage17LC0004

CONSTRUCTION OF REVETMENT ALONG LIBUGANON RIVER, DOWNSTREAM, STA. 9+650-STA. 9+984, BRGY. MANIKI, KAPALONG, DAVAO DEL NORTE

CONSTRUCTION OF REVETMENT ALONG LIBUGANON RIVER, DOWNSTREAM, STA. 9+650-STA. 9+984, BRGY. MANIKI, KAPALONG, DAVAO DEL NORTE is a DPWH-tracked public work in Davao del Norte DEO, Region XI. Reported contract value: ₱47,872,000.00. Status: Reported complete (DPWH). Contractor on record: FFJJ CONST. Figures trace to dpwh.

Davao del Norte DEO, Region XI
Region: Region XI

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱46,483

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-D-17-0025737 · ₱6,325,000 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17LC0004 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-03-20 → 2024-10-30

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (revetment)

₱143,329 per linear m= 1.0x the Region XI median (n=93)

Contract cost ₱47,872,000 ÷ 334 linear m read from the DPWH title (“STA. 9+650-STA. 9+984”; station range length (Sta. a+b to c+d)). National percentile: 56. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Davao del Norte

Based on the coordinates published with the DPWH record and NOAH file DavaoDelNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF REVETMENT ALONG LIBUGANON RIVER, DOWNSTREAM, STA. 9+650-STA. 9+984, BRGY. MANIKI, KAPALONG, DAVAO DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱46,483,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Tagum Libuganon River Flood Control (Downstream), Sta. 6+376 - Sta. 8+020 Including ROW, Brgy. Maniki, Kapalong, Davao del Norte
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-D-17-0025737

₱6,325,000.00 · FY2017

Released to Iwahig Prison an Penal Farm (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

788 projects · ₱27.5B total · 2 flags

4. Implementation

Contract Amount

₱47,872,000.00

Progress

Reported complete (DPWH)

Start Date

March 10, 2017

Target End

October 16, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.