CONSTRUCTION OF RIVER CONTROL SYSTEM AND REHABILITATION OF WATERWAYS ALONG GUIGUINTO RIVER BRGY. MALIS GUIGUINTO, BULACAN (STA. 05+067 TO STA. 05+267)
CONSTRUCTION OF RIVER CONTROL SYSTEM AND REHABILITATION OF WATERWAYS ALONG GUIGUINTO RIVER BRGY. MALIS GUIGUINTO, BULACAN (STA. 05+067 TO STA. 05+267) is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱48,247,315.97. Status: Reported complete (DPWH). Contractor on record: M3 KONSTRACT CORP FORMERLY:MARGARITA CONST. Figures trace to dpwh.
Total Contract Cost

