CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER, TAMURONG SECTION PHASE II, CAOAYAN, ILOCOS SUR
CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER, TAMURONG SECTION PHASE II, CAOAYAN, ILOCOS SUR is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱60,824,230.78. Status: Reported complete (DPWH). Contractor on record: 739 BUILDERS. Figures trace to dpwh.
Total Contract Cost

