RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, ALULING BRIDGE (B04269LZ) ALONG CERVANTES-BONTOC ROAD
RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, ALULING BRIDGE (B04269LZ) ALONG CERVANTES-BONTOC ROAD is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱19,300,000.00. Status: Reported complete (DPWH). Contractor on record: ALPHATEC CHEMICAL CORP. Figures trace to dpwh.
Total Contract Cost
