Flood Control and Drainage23AA0029

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND FACILITIES ALONG LAOAG RIVER BASIN AND TRIBUTARIES, BARANGAY MANGITAYAG, PIDDIG, ILOCOS NORTE

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND FACILITIES ALONG LAOAG RIVER BASIN AND TRIBUTARIES, BARANGAY MANGITAYAG, PIDDIG, ILOCOS NORTE is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱47,038,749.71. Status: Past target date (DPWH On-Going). Contractor on record: PERRC INC FORMERLY: P E R R C CONST. Figures trace to dpwh.

Region I, Region I
Region: Region I

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2023 GAA. DBM GAA FY2023

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

43 projects · ₱2.5B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRASTRUCTURE PROJS. ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL RDS. &/OR BRS. (OR,RDS. THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONST. OF BYPASS RD. (PHASE 8) AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE

Region III, Region III

2024₱283.7M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL RDS. &/OR BRS. (OR,RDS. THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONST. OF BYPASS RD. AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE CITY (PHASE 9), B

Region III, Region III

2024₱193.0M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS & BRIDGES-LOCAL ROADS-CONSTRUCTION OF BYPASS ROAD AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE, PROVINCE OF BULACAN

Region III, Region III

2021₱188.0M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE STRUCTURES & OTHER ANCILLARY WORKS, KO139+800-KO141+891

Region IV-B, Region IV-B

2018₱144.8M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE & OTHER ANCILLARY WORKS, KO226+400-KO226+537; KO226+562-KO228+954, BATARAZA, PALAWAN

Region IV-B, Region IV-B

2018₱144.8M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO (2) TO SIX (6) LANES INCL DRAINAGE STRUCTURES AND OTHER ANCILLARY WORKS K0175+627-K0176+185; K0176+194-K0177+880, BROOKE'S POINT, PALAWAN

Region IV-B, Region IV-B

2018₱135.1M
Reported complete (DPWH)
View all 43 projects →

4. Implementation

Contract Amount

₱47,038,749.71

Progress

Past target date (DPWH On-Going)

Start Date

April 17, 2023

Target End

January 26, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.