Roads24HK0069

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-DUMAGUETE NORTH ROAD-K0000+308-K0001+810, DUMAGUETE CITY, NEGROS ORIENTAL

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-DUMAGUETE NORTH ROAD-K0000+308-K0001+810, DUMAGUETE CITY, NEGROS ORIENTAL is a DPWH-tracked public work in Negros Oriental 2nd DEO, Negros Island Region. Reported contract value: ₱42,999,460.00. Status: Reported complete (DPWH). Contractor on record: PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS. Figures trace to dpwh.

Negros Oriental 2nd DEO, Negros Island Region
Region: Negros Island Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24HK0069 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-06-17 → 2021-06-17

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱28,628,136 per km= 1.3x the Negros Island Region median (n=254)

Contract cost ₱42,999,460 ÷ 1.502 km read from the DPWH title (“K0000+308-K0001+810”; K-post / station range length). National percentile: 53. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-DUMAGUETE NORTH ROAD-K0000+308-K0001+810, DUMAGUETE CITY, NEGROS ORIENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Dike, Barangay Panalaan, Bais City, Negros Oriental
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Negros Oriental 2nd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

276 projects · ₱11.8B total · 28 flags

Other projects by this contractor

No sat.

CSSP, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, REHAB./ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG BAIS-KABANKALAN RD - K0070+000 - K0071+000, K0075 + 459 - K0076 + 598, K0087+000-K0088+054, K0090+00-K0091+000,

Region VII, Region VII

2024₱253.4M
Past target date (DPWH On-Going)
No sat.

IMPROVEMENT/WIDENING OF DUMAGUETE SOUTH RD INCLUDING RROW (S00275NR), K0011+360 - K0012+277.46; K0012+310 - K0016+340, BACONG, NEGROS ORIENTAL

Negros Oriental 3rd DEO, Negros Island Region

2017₱152.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SEAWALL, BARANGAY NORTH POBLACION, JIMALALUD, NEGROS ORIENTAL

Negros Island Region, Negros Island Region

2025₱149.6M
Past target date (DPWH On-Going)
No sat.

IMPROVEMENT/ WIDENING OF METRO DUMAGUETE DIVERSION ROAD INCL. RROW, DUMAGUETE CITY, NEGROS ORIENTAL

Negros Oriental 2nd DEO, Negros Island Region

2017₱146.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS DUMAGUETE NORTH RD-K0025+000-K0025+223, K0025+238-K0026+000, K0027+598-K0028+740, NEGROS ORIENTAL PROVINCE

Region VII, Region VII

2020₱144.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE : SECONDARY ROADS: STA. CATALINA-PAMPLONA-TANJAY CITY - K0067 + 500 - K0072 + 000, STA. CATALINA, NEGROS ORIENTAL

Negros Oriental 3rd DEO, Negros Island Region

2025₱144.6M
Past target date (DPWH On-Going)
View all 276 projects →

4. Implementation

Contract Amount

₱42,999,460.00

Progress

Reported complete (DPWH)

Start Date

February 27, 2024

Target End

June 3, 2024