CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF CALAOAAN FLOOD CONTROL LEADING OUTFALL TO PARAS-SAN NICOLAS, CANDON CITY, ILOCOS SUR
CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF CALAOAAN FLOOD CONTROL LEADING OUTFALL TO PARAS-SAN NICOLAS, CANDON CITY, ILOCOS SUR is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱18,710,197.21. Status: Past target date (DPWH On-Going). Contractor on record: NGEC-NESTOR GEN ENGINEERING. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
