CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG PRINCIPAL RIVER BASINS, BUAYA RIVER BASIN: CONSTRUCTION OF BALIDBID FLOOD CONTROL, BALIDBID, SALCEDO, ILOCOS SUR (STA. 4+000-STA. 4+481)
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG PRINCIPAL RIVER BASINS, BUAYA RIVER BASIN: CONSTRUCTION OF BALIDBID FLOOD CONTROL, BALIDBID, SALCEDO, ILOCOS SUR (STA. 4+000-STA. 4+481) is a DPWH-tracked public work in Ilocos Sur 2nd DEO, Region I. Reported contract value: ₱7,371,902.45. Status: Reported complete (DPWH). Contractor on record: NGEC-NESTOR GEN ENGINEERING. Figures trace to dpwh.
Total Contract Cost